THE PROVEN PROCESS
We get involved early, architect the system, and own the outcome. No handoffs. No finger-pointing. Just a line that works.
Define the Problem
We start by listening. Together, we identify your production challenges, operational constraints, and business goals. We define the problem before we talk about equipment.
Problem statement, objectives, and shared success criteria
System Architecture
We architect the system and select equipment OEM-agnostically. We design for flow, accumulation, and operator access. We create a detailed layout that fits your plant.
Integrated layout, equipment selection, and budgetary proposal
Integration & FAT
We integrate all components and own the Factory Acceptance Test (FAT). We ensure the system runs as designed before it leaves our floor. We don't ship problems.
Fully tested system ready for shipment
Install & Commission
We coordinate installation and commission the line. We stay until it runs at rate. We train your team and ensure a smooth handover.
Production-ready line and trained operators
Long-Term Support
We support you long after the install. We offer remote diagnostics, spare parts, and field service to keep your line running at peak performance.
Ongoing partnership and support
PROJECT TIMING & LEAD TIMES
Equipment Lead Times
Major capital equipment currently requires a 6–12 month horizon. Early selection secures production slots and protects your schedule.
Engineering & Design
Front-end engineering ensures integration details are solved before metal is cut, preventing costly field modifications and delays.
Installation Windows
We align installation with planned shutdowns and production schedules to minimize operational disruption and downtime.